>

  • The project considers straightening, dredging, and blasting of rocky sills to render 3442 km of the river navigable for ocean-going vessels.

  • The proposed navigational improvements are likely to have an impact on the flood regime of the Upper Paraguay river.

  • Channel straightening will accelerate the concentration of flood runoff and increase the flood wave peaks.

Next:  03            Previous:  01            Last:  10