IMPACTS OF SOITEC SOLAR PROJECTS

ON BOULEVARD AND SURROUNDING COMMUNITIES,

SAN DIEGO COUNTY, CALIFORNIA


Victor M. Ponce


December 2, 2013



EXECUTIVE SUMMARY

The planned industrial-scale development of solar energy in Boulevard and surrounding communities is likely to permanently change the essentially rural character of these East San Diego County communities. While the negative impacts of energy development will be felt locally, its benefits will accrue somewhere else, very likely in distant urban settings. Boulevard has an arid climate, with limited precipitation, an avowed scarcity of surface water, and often highly destructive floodwaters. Over the years, the lack of reliable surface water has forced local people to rely on groundwater for their survival.

Groundwater is the only source of potable water in the Boulevard area. Yet the prevailing arid climate effectively means that groundwater recharge is very limited. In addition, calculations of groundwater recharge are generally flawed due to the uncertainty regarding the applicable control volume. Thus, excessive reliance on limited groundwater resources, over and above current consumption, is bound to place at risk existing uses and users, both natural and anthropogenic. Domestic groundwater users on both sides of the U.S.-Mexico border are likely to be affected.

At this juncture, the issues of groundwater sustainability are, unfortunately, not very well defined. Sustainable yield is reckoned to be a moving target, subject to adaptive management. To remain comprehensive, sustainable yield must include hydrological, ecohydrological, and socioeconomic considerations. In the case of the Boulevard Soitec projects, it is difficult to reconcile the planned/postulated amounts of groundwater capture with the demonstrated needs of riparian and upland ecosystems, which provide valuable natural services. No development, no matter how lofty its aim, should place at risk existing natural ecosystems. Other considerations notwithstanding, the Boulevard Soitec projects must resort to imported water to satisfy their needs.



1.  INTRODUCTION

[Description of Projects]   [Water Resources]   [Rugged Solar]   [Tierra del Sol Solar]   [LanEast/LanWest Solar]   [Other Impacts]   [Summary]   [Appendix]   [Acknowledgements]   [Endnotes]   [References]      [Top]  

1.1  Background

Soitec Solar Development LLC (herein Soitec) is a manufacturer and supplier of solar energy components. In association with San Diego Gas and Electric (SDG&E), Soitec is planning to develop four (4) solar farm projects in Boulevard and surrounding communities. Boulevard is a census-designated place (CDP) in the Mountain Empire area of Southeastern San Diego County. The Boulevard Planning Area is a rural semiarid desert adjacent to the U.S.-Mexico border, comprising 55,350 acres (Fig. 2).

General location of Boulevard Planning Area
 County of San Diego

Fig. 2  General location of Boulevard Planning Area [Click on image to enlarge].

The communities directly impacted by the solar projects are: (1) Boulevard, (2) Tierra del Sol, (3) McCain Valley and (4) Manzanita/Bankhead Springs. Other impacted neighboring communities include Jewel Valley and Jacumba (Fig. 3). Existing homes and wells in these communities are in close proximity to the solar projects; some as close as 100 ft. Thus, the question of diverse possible negative impacts arises.

Detail of Boulevard Planning Area
 County of San Diego

Fig. 3  Detail of Boulevard Planning Area [Click on image to enlarge].

The County of San Diego has recently approved a General Plan Update to the Boulevard Planning Area Community Plan. The Land Use Section 1.1 states:

"[To] prohibit ... industrial-scale projects or facilities that induce growth and detract from or degrade the limited groundwater resources, water and air quality, visual and natural resources, abundant wildlife, and historic rural character of the Boulevard area."

This statement notwithstanding, the San Diego County Board of Supervisors recently approved (May 8, 2013) the Wind Energy Ordinance and Boulevard Community Plan Amendment. This amendment designates renewable energy projects such as solar and wind as "not industrial-scale" for purposes of the community plan. Thus, the amendment allows these projects to be developed, apparently with no limit, thereby contradicting the general premise of the planning document.

The wisdom of designating solar energy projects in the Boulevard Planning Area as "not industrial-scale" is subject to argument. Industrial-scale implies extensive commercial production of a commodity. The designation is questionable because the large quantities of electrical energy to be commercially produced in Boulevard are intended for consumption elsewhere, in distant urban settings.

Once in place, the energy projects will change the essentially rural character of Boulevard and surrounding communities into one dominated by alternative energy production, ostensibly for consumption elsewhere. A total of thirteen (13) alternative energy and related projects are being considered for the Boulevard area. The cumulative impacts of these large-scale energy projects on the water resources of the region have been recently documented by Ponce (2013). This report estimates that with the implementation of these projects, the future water demand will be more than twice the existing water demand.

A fraction of the additional water is likely to come from groundwater capture in the Boulevard vicinity. On July 2013, the California Public Utilities Commission (CPUC) revised the East County (ECO) Substation Water Supply Plan to include bulk groundwater sales from three (3) wells located on the Campo Indian Reservation, in the amount of 53.75 million gallons (Beta 2013a). This amounts to 165 ac-ft of groundwater capture.

On September 30, 2013, SDG&E requested a further increase to 100 million gallons for the ECO Substation construction water needs. This amount is to be supplied by imported water (City of San Diego, 50 million gallons) and local water from two sources: (1) Live Oak Springs Water Company, 35 million gallons; and (2) Jacumba Municipal Water District, 15 million gallons. The request amounts to a total of 307 ac-ft of water, of which half (153.5 ac-ft) is likely to come from local groundwater capture (Beta 2013b). Of the 100 million gallons requested, 90 million were approved on October 1, 2013, of which 50 million are likely to come from groundwater (State of California Public Utilities Commission 2013).

This report focuses on the impacts of the Soitec solar projects on the natural resources of the region, including water, soil, and vegetation. Other impacts, such as impacts to ecological and aesthetic resources, are also considered.


1.2  Soitec solar projects

Soitec is planning to develop four (4) solar farm projects in the Boulevard area in the near future. These projects are summarized in Table 1. The location of these projects is shown in Figs. 4 and 5.

Table 1.  Soitec Solar Projects planned in Boulevard, California.
No. Solar Project Capacity
(MW)
No. of
trackers
Area
(ac)
Date of planned
operation
1 Rugged Solar 80 3,588 765 December 31, 2014
2 Tierra del Sol Solar 60 2,538 420 December 31, 2014
3 LanEast Solar 22 900 233 October 31, 2014
4 LanWest Solar 6.5 264 55 February 28, 2014
5 Total Soitec in Boulevard 168.5 7,290 1,473 December 2014

Location of Soitec Solar Projects
 County of San Diego

Fig. 4  Location of Soitec solar projects in San Diego County [Click on image to enlarge].

Location of Soitec Solar Projects
 County of San Diego

Fig. 5  Detailed location of Soitec solar projects [Click on image to enlarge].


2.  DESCRIPTION OF PROJECTS

[Water Resources]   [Rugged Solar]   [Tierra del Sol Solar]   [LanEast/LanWest Solar]   [Other Impacts]   [Summary]   [Appendix]   [Acknowledgements]   [Endnotes]   [References]      [Top]   [Introduction]  

2.1  Rugged Solar Farm

The proposed Rugged Solar Farm is located north of Interstate Highway 8 (I-8) and east of Ribbonwood Road, extending about 0.5 miles east of McCain Valley Road. The project covers an area of 765 acres in two separate areas (Fig. 6): (1) the larger area is located between Ribbonwood Road and McCain Valley Road, and (2) the smaller area is located immediately east of McCain Valley Road. A portion of the project lies within the floodplain of Tule Creek, which runs through the McCain Valley.

Location of Rugged Solar Farm
 County of San Diego

Fig. 6  Location of Rugged Solar Farm [Click on image to enlarge].

The Rugged Solar Farm project features approximately 3,588 units of concentrating photovoltaic (CPV) systems (Fig. 7), utilizing dual-axis trackers and including inverter transformer units, with a generating capacity up to 80 MW.1 Each one of the trackers measures 25' × 48', with a surface area of 1,200 sq ft (Fig. 8).

Detail of Rugged Solar Farm
 County of San Diego

Fig. 7  Detail of Rugged Solar Farm [Click on image to enlarge].

Rugged Solar Farm tracker elevation detail
 County of San Diego

Fig. 8  Rugged Solar Farm tracker elevation detail [Click on image to enlarge].


Other project elements include:

  • An electrical collection system linking the trackers to the onsite substation,

  • A 7,500-sq ft O&M building,

  • A 2-ac onsite private collector substation site,

  • Sixty-one (61) inverter/transformer enclosures,

  • 3 miles of overhead generator transmission line,

  • 20.5 miles of newly constructed load-bearing on-site access roads,

  • 46.5 miles of graded, non-load-bearing dirt service roads,

  • Three (3) permanent on-site water wells,

  • Five 20,000-gallon water storage tanks for fire suppression and tracker washing,

  • A septic tank and leach field, and

  • A 6-ft perimeter fencing topped with 1-ft of security barbed wire.

2.2  Tierra del Sol Solar Farm

The proposed Tierra del Sol Solar Farm is located in the unincorporated community of Tierra del Sol, in San Diego County, adjacent and immediately north of the U.S.-Mexico border, approximately 3.5 miles south of State Route 94 (Fig. 9). A project vicinity map is shown in Fig. 10. The project's proximity to the community of Jardines del Rincon, on the other side of the border, is noted.

Location of Tierra del Sol Solar Farm
 County of San Diego

Fig. 9  Location of Tierra del Sol Solar Farm [Click on image to enlarge].

Tierra del Sol Solar Farm vicinity map
 County of San Diego

Fig. 10  Tierra del Sol Solar Farm vicinity map [Click on image to enlarge].

Tierra del Sol Solar Farm features 2,538 units of concentrating photovoltaic (CPV) systems (Fig. 11), utilizing dual-axis trackers with inverter transformer units, with a generating capacity up to 60 MW. Each one of the trackers measures 25' × 48', with a surface area of 1,200 sq ft (Fig. 12).

The overall project area is 420 acres, and it comprises the following features:

  • 2,538 CPV trackers,

  • Underground cable systems,

  • 4-ac O&M annex building,

  • On-site substation switchyard,

  • Four (4) 10,000-gallon water-storage tanks,

  • Six (6) miles transmission line to the [rebuilt] Boulevard Substation,

  • 1.5 miles of new access roads,

  • Security fencing, and

  • On-site water well to supply 3.68 ac-ft of groundwater on an annual basis.

Preliminary site plan of Tierra del Sol Solar Farm
 County of San Diego

Fig. 11  Preliminary site plan of Tierra del Sol Solar Farm [Click on image to enlarge].

Preliminary site plan of Tierra del Sol Solar Farm
 County of San Diego

Fig. 12  Tierra del Sol Solar Farm tracker elevation detail [Click on image to enlarge].

2.3  LanEast Solar

The proposed LanEast Solar Farm is a 233-ac site bordered to the north by Interstate Highway 8 (I-8) and to the south by U.S. Route 80 (Old Highway 80) (Fig. 13). McCain Valley Road traverses through the project site from north to south. Note that the LanEast and LanWest solar farms are adjacent to each other (Fig. 13).

LanEast (red border) and LanWest (green border) Solar Farms project sites
 Google Earth ®

Fig. 13  LanEast (red border) and LanWest (green border) project sites
[Click on image to enlarge].

The LanEast solar project would produce up to 22 MW of electrical energy using approximately 900 CPV trackers. Each one of these trackers measures 25' × 48', with a surface area of 1,200 sq ft, similar to that shown in Figs. 8 and 12.

In addition to the trackers, the following are required: (1) an on-site collector substation, (2) an on-site O&M annex building, and (3) an overhead transmission line. The latter would connect the on-site collector substation to SDG&E's new Boulevard substation located approximately 1,000 ft southwest of the project site.

2.4  LanWest Solar

The proposed LanWest Solar Farm is a 55-ac site bordered to the north by Interstate Highway 8 (I-8) and to the south by U.S. Route 80 (Old Highway 80) (Fig. 13). The project would produce up to 6.5 MW of electrical energy using approximately 264 CPV trackers similar to that shown in Figs. 8 and 12. As with LanEast, the power generated would be delivered to SDG&E's new Boulevard substation. A plot plan is shown in Fig. 14.

LanWest plot plan
 County of San Diego

Fig. 14  LanWest Solar plot plan [Click on image to enlarge].


3.  WATER RESOURCES

[Rugged Solar]   [Tierra del Sol Solar]   [LanEast/LanWest Solar]   [Other Impacts]   [Summary]   [Appendix]   [Acknowledgements]   [Endnotes]   [References]      [Top]   [Introduction]   [Description of Projects]  

3.1  Surface water

All water resources, including surface and groundwater, originate in precipitation. Boulevard and surrounding communities are located in southeast San Diego County, where there is no import of surface water. Thus, the area is forced to rely solely on groundwater, which is replenished only from precipitation.

Table 2 shows precipitation data for two Boulevard climatological stations. Based on this data, the weighted average of mean annual precipitation in Boulevard is 15.82 in, which is equivalent to 401.8 mm.

Table 2.  Summary of precipitation data for two Boulevard climatological stations.
Station name Latitude Longitude Elev.
(ft)
Period
of record
No.
of years
of record
Mean annual
precipitation
(in)
Boulevard 32o 40' 116o 20' 335 1925-1967 43 14.84
Boulevard 2 32o 40' 116o 18' 360 1970-1994 25 17.51
Weighted average --- --- --- --- --- 15.82

Table 3 shows the climatic spectrum in subtropical regions. The Boulevard area classifies as an arid-semiarid region (Fig. 15). An arid-semiarid region has little surface water and, consequently, little runoff. The runoff coefficient is typically around 10-15% of precipitation. Surface runoff is markedly seasonal and almost none of it is stored for economic use.


Table 3. The climatic spectrum in subtropical regions.
Climatic region Superarid Hyperarid Arid Semiarid
Precipitation (mm) < 100 100-200 200-400 400-800
Climatic region Subhumid Humid Hyperhumid Superhumid
Precipitation (mm) 800-1600 1600-3200 3200-6400 > 6400


The McCain Valley, Boulevard, San Diego County, California

Fig. 15  The McCain Valley, Boulevard, San Diego County, California.

The lack of surface water has forced Boulevard and surrounding communities to rely almost exclusively on groundwater for their survival. The Boulevard area straddles the Campo-Cottonwood aquifer on its eastern boundary (Fig. 16). This aquifer is part of the Tijuana river watershed, which spans both the United States and neighboring Mexico to the south. In 1993, the Environmental Protection Agency (EPA) designated the Campo-Cottonwood aquifer as sole source.2 This federal designation is meant to protect the groundwater resource to assure its preservation and sustainability.

Campo-Cottonwood Sole Source Aquifer
 Environmental Protection Agency

Fig. 16  Location of Campo-Cottonwood Creek Sole Source Aquifer
[Click on image to enlarge].

3.2  Groundwater

Groundwater is almost always in constant movement, driven by regional hydraulic gradients (Fig. 17). The quantity of groundwater greatly exceeds that of surface water; the ratio is about 23:1 (U.S. Geological Survey). Yet, when the typical timespan of human interest is considered (months and years), most groundwater is replenished too slowly. Thus, issues of groundwater depletion and, more recently, groundwater sustainability, are very relevant in contemporary society. The understanding of groundwater flow processes helps in the assessment of its potential as a natural resource for human consumption.

The fate of groundwater is either:

  1. To return to the surface waters as exfiltration to springs or baseflow, or to support riparian and wetland ecosystems, or

  2. To flow directly into the nearest ocean.

Globally, about 98% of groundwater appears as springs or baseflow, or, somewhere downstream, through riparian and wetland ecosystems. Only 2% of groundwater flows directly into the ocean (World Water Balance 1978; L'vovich 1979).

Typical pattern and direction of groundwater flow
 U.S. Geological Survey

Fig. 17  Typical pattern and direction of groundwater flow.

3.3  Groundwater recharge

The recharge to groundwater is commonly expressed as a percentage of precipitation. Arid regions have proportionally less recharge to groundwater than humid regions. In theory, the recharge to groundwater can be evaluated by performing a water balance, where infiltration (I) is calculated by subtracting evaporation (E), evapotranspiration (T) and runoff (Q) from precipitation (P) (Fig. 18).

Graphical depiction of the components of the water balance

Fig. 18  Components of the water balance.

In practice, however, it is very likely that the natural prototype or system will not lend itself readily to description. While a fraction of the infiltration does indeed go on to constitute recharge, another fraction returns to the atmosphere as the evaporation and evapotranspiration of wetlands and riparian ecosystems. In general, the soil system is heterogenous, anisotropic, and subject to spatial and temporal variations in soil/air/water complex characteristics. Therefore, it is almost impossible to discern with any degree of certainty what fraction of the infiltration actually resulted in recharge, and what fraction returned to the atmosphere as evaporation/evapotranspiration. Over the years, classical hydrology and hydrogeology have seemed unable to resolve this dichotomy.

The situation has been partly resolved by L'vovich, who developed an alternate formulation of the water balance using the concept of catchment wetting (L'vovich 1979, Ponce 1995). Catchment wetting is the fraction of precipitation not contributing to direct surface runoff.

L'vovich's approach to the water balance consists of the following additive separation technique:

  • Precipitation P is separated into direct surface runoff S and catchment wetting W.

  • Catchment wetting W is separated into baseflow U and vaporization V.

  • Vaporization V is separated into evaporation E and evapotranspiration T.

  • Runoff R is separated into direct suface runoff S and baseflow U.

  • Precipitation P is confirmed to the sum of runoff R and vaporization V.

A comparison of water balance formulations using classical hydrology and L'vovich's approach is shown in Table 4.

Table 4.  Comparison of water balance formulations.
Classical hydrology L'vovich's approach
I = P - E - T - Q

P = S + W

W = U + V

V = E + T

R = S + U

P = R + V

Barring a precise phenomenological calculation of groundwater recharge for the Boulevard area, the only other recourse is to evaluate groundwater recharge using a synthetic approach, i.e., on the basis of a host of data and analyses reported in the literature, keeping in mind that recharge is a function of precipitation. On the dry side of the climatic spectrum, where precipitation is close to zero, the recharge percentage is also near zero. This is the case of superarid regions, with mean annual precipitation less than 100 mm. Conversely, on the wet side of the climatic spectrum, with precipitation greater than 6,400 mm, recharge is a sizable fraction of precipitation. This is the case of superhumid regions (Table 2). In the middle of the climatic spectrum, with mean annual precipitation of about 800 mm, recharge is estimated to be around 20% (Ponce 2012 [1]).

Scanlon et al. (2006) have performed a global synthesis of groundwater recharge in semiarid and arid regions, using approximately 140 study areas, including the U.S. Southwest. They report values of recharge varying between 0.1% and 5% of mean annual precipitation. A value of groundwater recharge for the Boulevard and surrounding communities at most equal to 5% of mean annual precipitation is considered reasonable, given that mean annual precipitation is equal to 15.82 in or 401.8 mm, corresponding to an arid/semiarid climate.

Thus, the average annual groundwater recharge for the Boulevard area is:  (5/100) × (15.82/12) = 0.066 ft.


4.  RUGGED SOLAR

[Tierra del Sol Solar]   [LanEast/LanWest Solar]   [Other Impacts]   [Summary]   [Appendix]   [Acknowledgements]   [Endnotes]   [References]      [Top]   [Introduction]   [Description of Projects]   [Water Resources]  

4.1 Flood risk

The Rugged Solar Farm project encompasses areas of the McCain Valley, portions of it lying directly on the flood plain of Tule Creek. Figure 19 shows an aerial perspective of the McCain Valley and Tule Creek, with the project area boundaries placed on top. The wisdom of placing a solar project in the immediate vicinity of a desert wash is open to question; sooner or later part of the installations will be subject to flooding.3

Aerial perspective of vicinity of Rugged Solar Farm
 Google Earth ®

Fig. 19  Aerial perspective of vicinity of Rugged Solar Farm [Click on image to enlarge].

Hydrologic calculations for the project site are shown in Table 5. The flood discharge is likely to be 15,605 cfs for an infrequent flood.4

Table 5.  Hydrologic data.
No. Description Value
1 Maximum headwater elevation (above m.s.l.) 5,818 ft
2 Drainage area measured at entrance to Tule Canyon, at Elev. 3,200 ft 32.5 sq mi
3 Drainage area to location most downstream of project, at Elev. 3,520 ft 23.5 sq mi
4 Flood discharge 15,605 cfs

Hydraulic calculations are shown in Table 6. The flood flow depth (1.5 ft) was estimated based on local experience.5 For the given hydraulic conditions, the calculated flood discharge is 16,673 cfs. This discharge agrees very closely with the hydrologic value (15,605 cfs) shown in Table 5. Moreover, the calculated flow velocity, 5.56 fps, is considered relatively high, while the Froude number (0.8) is close to critical, which is typical of flood stage conditions.6

Table 6.  Hydraulic data.
No. Description Value
1 Average floodplain width along project site 2,000 ft
2 Estimated floodplain flow depth 1.5 ft
3 Estimated Manning's n 0.035
4 Mean bottom slope in reach of interest 0.01
5 Discharge 16,673 cfs
6 Mean velocity 5.56 fps
7 Froude number 0.8

The Rugged Solar Farm project will be subject to extensive flooding during mean annual (2-yr frequency) floods, with flow depths exceeding 1.5 ft and velocities exceeding 5.56 fps. The extent to which these flow depths and velocities will affect the normal functioning and operation of the solar trackers and associated electrical equipment [located directly on the path of the flood] is unknown.7 Also unknown is the extent of backwater created by the flow obstructions, and how the backwater will affect neighboring properties.

Extensive flood damage has been experienced within the past 40 years in the vicinity of Tule Creek. On September 9, 1976, tropical storm Kathleen brushed the Pacific coast off the Baja California Peninsula and headed north to California. The storm dropped a foot of rainfall in some areas. Flooding caused catastrophic destruction in Ocotillo, 24 km east of Tule Creek, and six people drowned in the area.8

Tropical storms in Southern California tend to be associated with El Niño events (NASA 2012). Moreover, recent climatological research reveals the mark of human activities (i.e., anthropogenic climate change) in the late 20th-century's unusually active period for El Niño (Scripps Institution of Oceanography 2013). Thus, it is to be expected that stronger El Niño events and, therefore, more frequent tropical storms will hit Southern California and the Boulevard area in the foreseeable future.

4.2  Water demands of natural ecosystems

The riparian and spring-fed upland ecosytems (grasses, shrubs, and trees) of the Boulevard area are fully dependent on groundwater. The region has a pronounced arid climate; therefore, surface water is strongly seasonal and surface runoff is ephemeral. Typically, groundwater levels do not intersect streams; therefore, baseflow is almost nonexistent and local streams (washes) carry flow only in direct response to precipitation. Groundwater is replenished only from precipitation, and precipitation generally increases with altitude.

The regional aquifers are mostly fractured rock aquifers, which feature faster hydraulic response (higher hydraulic conductivity) and much lesser specific yield (smaller coefficient of storage) than comparably sized alluvial aquifers. Recharge occurs at the higher elevations and discharge at the lower elevations, driven by prevailing hydraulic gradients (Fig. 20).

Recharge to and discharge from groundwater
 Minister of Environment, British Columbia, Canada

Fig. 20  Recharge to and discharge from groundwater.

A distinct property of fractured-rock aquifers is that they feature preferential paths for flow movement, which may randomly intersect the land surface, resulting in local springs. This is particularly the case of the Boulevard area. Ponce (2007) [1] has documented eleven (11) springs in the Tierra del Sol watershed, close to the U.S.-Mexico border (Fig. 21). The largest of these springs, lying immediately west [downstream] of a very large dike [shown in red in Fig. 21], measures 1,465-ft long and about 5-ft wide (Fig. 22). Predictably, a large specimen of coast live oak (Quercus agrifolia) sits at the exact location of the spring (Fig. 23), confirming the direct relationship between local springs and the presence of large trees in the vicinity.

Location of springs in Tierra del Sol

Fig. 21  Location of springs in Tierra del Sol (Ponce 2007 [2]).

Large pegmatitic dike in Turner Ranch, Tierra del Sol

Fig. 22  Large pegmatitic dike in Turner Ranch, Tierra del Sol (Ponce 2007 [3]).

A large specimen of coast live oak

Fig. 23  A large specimen of coast live oak, near the western extremity of a large dike
in Tierra del Sol. Note the presence of substantial water and moisture
on the ground (Ponce 2007 [4]).

4.3  Water needs of natural ecosystems in the Rugged Solar site

The Rugged Solar site lies within the confines of McCain Valley, being crossed by Tule Creek from northwest to southeast (Fig. 19). The maximum headwater elevation, at the Tecate Divide, is 5,618 ft, while the elevation of Tule Creek proper varies from about 4,200 ft near the entrance to McCain Valley, to 3,200 ft near the entrance to Tule Canyon, a drop of 1,000 ft in the valley, and 2,418 ft in total. The underlying aquifer is a fractured rock aquifer, with characteristically fast response and relatively small storage capacity (Freeze and Cherry 1979).

Rock outcrops spread along the foothills of McCain Valley reveal the extent of the fractures. Figure 24 shows a typical fracture in a rock outcrop, on the McCain Valley Conservation Camp, immediately adjacent to the Rugged Solar site. The rocks vary from tonalites to granodiorites, depending on the location (Ponce 2006 [2]).9 Flow in fractured rock aquifers occurs primarily through the fractures, as opposed to through the matrix. Thus, flow in fractured rock aquifers is dominated by advection rather than by diffusion (Ponce 2007 [5]).

Rock outcrop showing typical fractures

Fig. 24  Rock outcrop showing typical fractures, adjacent to Soitec's Solar Rugged project site. Advection through fractures is the rule in fractured-rock aquifers.

Large fractures intersecting the ground surface lead to springs, which serve the purpose of providing much needed water to shrubs and trees growing in the immediate vicinity (Fig. 25). Many springs are found in the Upper McCain Valley; some are large enough to collect water on the surface for various uses. Several tribal residences located on the Manzanita reservation reportedly rely on spring-fed water sources for their domestic and livestock needs (see the boxed spring of Fig. 26). These residences and springs are located at higher elevations and will likely be some of the first to be impacted by the proposed groundwater capture in the lower McCain Valley. Capture amounts generally exceeding 100% of recharge are likely to lower groundwater levels substantially and negatively affect upland spring-fed vegetation and riparian and wetland ecosystems.

Spring-fed trees and other woody vegetation

Fig. 25  Spring-fed trees and chaparral along the foothills of McCain Valley.

Boxed spring located in Manzanita reservation

Fig. 26  Boxed spring located in the Manzanita reservation, along the McCain Valley foothills.

An important community of coast live oak (Quercus agrifolia) is present in Dick McCain's Ranch (now the McCain Valley Conservation Camp), in the foothills of McCain Valley, at approximate elevation 3530 ft (Fig. 27). Within this community, one extraordinarily large specimen has been documented, with a measured circumference [at breast height] of 7.55 m, resulting in an "equivalent diameter" of 2.4 m (Fig. 28). This tree is estimated to be at least 300 years old.10 This is a clear indication of the presence of large quantities of moisture in the soil, within reach of the roots.

A community of coast live oak in the foothills of the McCain valley
 Google Earth ®

Fig. 27  A community of coast live oak in the foothills of the McCain valley.

A very large soeciment of coast live oak
 in the McCain Valley

Fig. 28  A very large specimen of coast live oak in Dick McCain's Ranch.

Coast live oak is found in the coastal ranges of California, from north central California to northern Baja California (NRCS 2013). Figure 29 shows another large specimen of coast live oak, located in Rancho Banchetti, near Tecate, Baja California, at a straight distance of 23.5 km south from the tree shown in Fig. 29. The Rancho Banchetti tree, with a circumference of 5.13 m and an equivalent diameter of 1.63 m, has been estimated to be more than 300 years old.11

A large specimen of coast live oak in Rancho Banchetti

Fig. 29  A large specimen of coast live oak in Rancho Banchetti, Tecate, Baja California.

Figure 30 shows the location of a spring-fed pond in Dick McCain's Ranch [point of the red arrow], immediately south of the coast live oak community shown in Fig. 27. The pond, shown in Fig. 31, shows a substantial amount of stored water, despite that fact that the photo was taken on August 1, 2013, near the end of the dry season. Figure 32 shows a closeup of the spring feeding into the pond. Figure 33 shows a thriving wetland near the location of the pond.

Location of the McCain Ranch pond in Boulevard country
 Google Earth ®

Fig. 30  Location of pond in Dick McCain's Ranch in Boulevard country.

Large pond in the McCain Ranch

Fig. 31  Large pond in Dick McCain's Ranch [photo taken August 1, 2013].

Spring feeding into the McCain pond in the Boulevard backcountry

Fig. 32  Spring feeding into pond in Dick McCain's Ranch.

A thriving wetland in the proximity of McCain pond

Fig. 33  A thriving wetland in the vicinity of Dick McCain's Ranch.

Figures 25 to 33 show conclusively that many Boulevard vegetative landscapes and related ecosystems are being fed from groundwater flowing near the surface and exfiltrating to the surface in the form of springs. Excessive pumping of groundwater is likely to lower the groundwater table and to negatively affect local ecosystems. Many examples in other regions attest to the fact that spring-fed and riparian ecosystems are negatively affected by excessive pumping of groundwater in the immediate vicinity; see, for instance, the seminal work of Meinzer (1927) and the case study of Ponce and Player (2008) in southwestern Utah (Fig. 34).

A riparian community impacted by groundwater pumping

Fig. 34  A riparian community impacted by groundwater pumping (Ponce and Player 2008).

4.4  Rugged Solar water demand

Table 7 shows the Rugged Solar project estimated water demands, including temporary construction and operational water demands (AECOM 2012). The total construction water demand is 73.16 ac-ft and the total operational water demand is 4.55 ac-ft.

Table 7.  Rugged Solar water demands.
Type of demand ActivityDescription Volume
(ac-ft)
Temporary
project
construction
1 Site preparation (clearing, grading) 68.83
2 Application of water/soil binding agent 4.33
1 + 2 Total construction water 73.16
Annual
operational
water use
1 Dust suppression 2.17
2 Panel washing 2.38
1 + 2 Total operational water 4.55

4.5  Groundwater supply

The water demands for the Rugged Solar project are proposed to be satisfied from groundwater from existing wells in the vicinity. Rugged Solar will use wells #6 and #6A, while Tule Wind will use wells #6, #6A, and #8 (Fig. 35) HDR Engineering 2011. Cumulative impacts on groundwater levels may be envisaged. Pumping from groundwater may proceed as long as it does not encroach upon existing groundwater rights, either natural or anthropogenic. For instance, Tule Lake, partially shown on the bottom right of Fig. 35, lies near the downtream end of Tule Creek, in relatively close proximity to the supply wells for the Rugged Solar project.

Location of existing wells
 Google Earth ®

Fig. 35  Approximate location of existing wells in the Rugged Solar project site.

All groundwater flow is in transit to lower elevations. All groundwater pumping comes from capture, and all capture is due to pumping (Seward et al. 2006; Ponce 2007 [6]). The greater the intensity of pumping, the greater the capture. Capture comes from decreases in natural discharge and increases in recharge (induced recharge), the latter coming from the surrounding areas.

The choice of control volume for the calculation of allowable groundwater capture is fraught with difficulties. All groundwater is connected; therefore, the size of the control volume is not readily discernible. A typical groundwater study usually considers the entire surface water basin. Such an approach fails to recognize that the boundary of a groundwater basin is not as topographically defined as that of the overlying surface water basin. For example, in an editorial in Ground Water, entitled "Safe yield and the water budget myth," Bredehoeft (1997) wrote:

"In my experience, the recharge, and certainly the change in recharge due to a development (induced recharge) is difficult, if not impossible, to quantify."

Increasing amounts of capture are likely to draw groundwater volumes from an increasing area. This fact has been thoroughly documented; see, for instance, the case study of Paradise Valley, Nevada, by Prudic and Herman (1996). In the case of Rugged Solar, taking the control volume as the drainage area to the location most downstream of the project would amount to 23.5 square miles (Table 5). This amount of capture would encroach upon local vegetative ecosystems, dependent as they are on shallow groundwater for their survival.

A conservative evaluation of groundwater availability, which does not encroach upon existing rights, both natural and human-induced, ought to be based solely on the Rugged Solar project area, which is 765 acres (Section 2.1). The mean annual recharge is 0.066 ft (Section 3.3). Therefore, the mean annual recharge in volumetric units is: 765 ac × 0.066 ft = 50.5 ac-ft. Table 8 summarizes the calculation of mean annual recharge for the Rugged Solar project.

Table 8.  Calculation of mean annual recharge for Rugged Solar.
No. Description Section Units Value
1 Project area 2.1 ac 765
2 Mean annual precipitation 3.1 in 15.82
ft 1.32
3 Mean annual recharge coefficient 3.3 % 5
4 Mean annual recharge 3.3 ft 0.066
5 Mean annual recharge 4.5 ac-ft 50.5

4.6  Sustainable groundwater yield

Pumping the entire amount of recharge, the so-called "safe yield" of past hydrogeologic practice, amounts to capturing the entire amount of discharge, a practice that is now widely discredited. Sophocleous (2000), among others, reckoned that safe yield ignores the fact that, over the long term, natural recharge is balanced by discharge from the aquifer by evapotranspiration, or by discharge into streams, springs, or seeps. Consequently, if pumping equals recharge, eventually streams, marshes and springs dry up (Ponce 2012 [2]). Continued pumping in excess of recharge may eventually deplete the aquifer.

It has now become clear that the practice of capturing 100% of the recharge is unsustainable (Ponce 2007 [7]). This fact has been demonstrated again and again, in both theory and practice. A significant amount of capture in one location, resembling the entire gross recharge, will eventually encroach upon other established rights.

Enlightened concepts of groundwater management presently argue that sustainable yield should be taken as a suitable fraction of recharge, the fraction varying between a conservative value of 10% and a compromise midrange value of 30%. Values exceeding 30% require detailed hydrological and ecohydrological studies to assure that pumping levels exceeding that threshold are not likely to affect baseflow and/or riparian/upland/wetland ecosystems in the vicinity (Maimone 2004).

Table 9 shows the available groundwater volume for the Rugged Solar project, assuming three suitable levels of capture-to-recharge percentage: 10%, 20%, and 30%. The maximum volume that could be pumped from the existing wells, and not encroach upon established rights, is 15.15 ac-ft. Yet the total construction water demand is 73.16 ac-ft. The pumping of this amount of groundwater in one year represents (73.16/50.5 ) × 100 = 145% of the mean annual recharge, a level of pumping that is sure to place at risk existing riparian/upland/wetland ecosystems.

Table 9.  Available groundwater volume for Rugged Solar.
No. Description Units Adopted value
1 Capture-to-recharge percentage % 10 20 30
2 Available annual groundwater capture ft 0.0066 0.0132 0.0198
3 Available annual groundwater volume ac-ft 5.05 10.10 15.15


5.  TIERRA DEL SOL SOLAR

[LanEast/LanWest Solar]   [Other Impacts]   [Summary]   [Appendix]   [Acknowledgements]   [Endnotes]   [References]      [Top]   [Introduction]   [Description of Projects]   [Water Resources]   [Rugged Solar]  

5.1  Location

The Tierra del Sol Solar Farm project is located in Tierra de Sol, a community of Boulevard (Figs. 4 and 5). The project encompasses 420 acres, delineated in red in Fig. 36, located immediately north of the U.S.-Mexico border. The project site abuts directly with the community of Jardines del Rincon, in the municipality of Tecate, Baja California.

Location of Tierra del Sol Solar Farm
 Google Earth ®

Fig. 36  Location of Tierra del Sol Solar Farm [Click on image to enlarge].

5.2  Tierra del Sol water demand

The construction water demand for Tierra del Sol Solar is 20 million gallons, for an estimated 12-month construction period (Soitec Solar EIR 2012). This amounts to 61.37 ac-ft. Thereafter, annual water use for the O&M Annex and to wash the CPV trackers is 3.68 ac-ft (Dudek 2012). Table 10 summarizes the water demands of the Tierra del Sol Solar project.

Table 10.  Tierra del Sol Solar water demands.
Description Volume (ac-ft)
Temporary project construction (one year) 61.37
Annual operational water use 3.68

5.3  Groundwater supply

At this juncture, the source of water for the Tierra del Sol Solar project remains uncertain. As in the case of Rugged Solar, pumping from groundwater may proceed as long as it does not encroach upon existing groundwater rights, either natural or anthropogenic (Section 4.5). A conservative evaluation of groundwater availability, which does not encroach upon existing rights, both natural and human-induced, is based on the Tierra del Sol Solar project area, which is 420 acres (Section 2.2).

The mean annual precipitation is 1.32 ft (Section 3.1). The estimated recharge coefficient is 5% (Section 3.3). Therefore, the mean annual recharge is:  0.05 × 1.32 = 0.066 ft. The mean annual recharge in volumetric units is:  420 ac × 0.066 ft = 27.72 ac-ft. Table 11 summarizes the calculation of mean annual recharge for the Tierra del Sol Solar project.

Table 11.  Calculation of mean annual recharge for Tierra del Sol Solar.
No. Description Section Units Value
1 Project area 2.2 ac 420
2 Mean annual precipitation 3.1 in 15.82
ft 1.32
3 Mean annual recharge coefficient 3.3 % 5
4 Mean annual recharge 3.3 ft 0.066
5 Mean annual recharge 5.2 ac-ft 27.72

5.4  Sustainable groundwater yield

Table 12 shows the available groundwater volume for the Tierra del Sol Solar project, assuming three suitable levels of capture-to-recharge percentage: 10%, 20%, and 30%. The maximum volume that could be pumped from existing wells and not encroach upon established rights is 8.31 ac-ft. Yet the total construction water demand is 61.37 ac-ft (Table 9). The pumping of this amount of groundwater in one year represents (61.37/27.7) × 100 = 221% of the mean annual recharge, a level of pumping that is sure to place at risk existing natural ecosystems.

Table 12.  Available groundwater volume for Tierra del Sol Solar.
No. Description Units Adopted value
1 Capture-to-recharge percentage % 10 20 30
2 Available annual groundwater capture ft 0.0066 0.0132 0.0198
3 Available annual groundwater volume ac-ft 2.77 5.54 8.31

5.5  Riparian and upland ecohydrology

Runoff from Tierra del Sol Solar project site flows in three main directions, shown in Fig. 37:

  1. To the east, to contribute to Unnamed Creek, which flows into Mexico at the border, immediately east of the project site,

  2. To the west, to contribute to Tierra del Sol Creek, which flows into Mexico at Roca Magisterial, and

  3. To the southwest, to contribute to Cañada Seca (Dry Creek), which flows south through Jardines del Rincon, which lies in Mexico proper.

Grading and removal of native vegetation, as part of normal land clearing, may result in increased flood flows into these creeks. In particular, Cañada Seca drains through the community of Jardines del Rincon, in Mexico proper, within close proximity of the Tierra del Sol project site (Fig. 38).

Aerial view of Tierra del Sol Solar and vicinity.
 Google Earth ®

Fig. 37  Surface drainage at Tierra del Sol Solar.

Maupin's 54-yr old tree stump in Tierra del Sol

Fig. 38  Cañada Seca, in Mexico, just south of the U.S.-Mexico border
(see U.S.-Mexico border fence in the background).

The total drainage area contributing to Unnamed Creek, wholly contained within the U.S., is 2,617 acres, or 4.09 square miles.12 Despite its arid climate, the surface and groundwater of this watershed are enough to support a thriving community of coast live oak (Fig. 39). Furthermore, the existing stream channel strongly indicates the presence of an important riparian corridor (Fig. 40).

A thriving community of coast live oak in Tierra del Sol

Fig. 39  A thriving community of coast live oak at the Maupin Ranch in Tierra del Sol.

Riparian corridor of coast live oak in unnamed creek of Tierra del Sol

Fig. 40  Riparian corridor in Unnamed Creek at the Maupin Ranch in Tierra del Sol.

The coast live oak forest located east of the Tierra del Sol Solar site appears to be thriving. Robert Maupin, a long-time local resident, recalls that in 1959 he personally cut down an apparently "dead" specimen of coast live oak within his property. Yet the tree was not dead. In 2013, 54 years later, Maupin measured the circumference of the new stump, at breast height, at 14.02 ft, which amounts to 4.27 m (Fig. 41).13 The equivalent diameter is 1.36 m, which indicates that the average growth rate of this tree has been 0.025 m/yr, by all accounts a significant growth rate for this native California species.14

Maupin's 54-yr old tree stump in Tierra del Sol

Fig. 41  A 54-yr old coast live oak tree in Tierra del Sol.

About 27% of the Tierra del Sol Solar project area drains east into Unnamed Creek shown in Fig. 40, while the remainder drains west toward Tierra del Sol Creek (Ponce 2006 [1]), and southwest toward Cañada Seca (Dry Creek), in Jardines del Rincon, Mexico (Fig. 37).

The pervasive presence of shallow groundwater is seen to extend beyond the well acknowledged riparian environment, to comprise even upland ecosystems in the vicinity. A case in point: The distinctive upland linear forest of red shank in the neighboring Tierra del Sol watershed. This forest runs from northwest to southeast (see red arrow of Fig. 42), with a longitudinal dimension of approximately 3,130 ft and an average width of about 100 ft, ending within a short distance of the Tierra del Sol Solar project site.15 The existence of this linear forest, or lineament, suggests an adaptation to predominantly linear fractures in the underlying rock aquifer (Ponce 2006 [3]).16

 Google Earth ®

Fig. 42  Aerial view of linear forest of red shank.

5.6  Impacts of groundwater capture

In the event of substantial local groundwater pumping, exceeding the recommended maximum level of 8.31 ac-ft, i.e., 30% of annual recharge, the Tierra del Sol Solar project will have to show that this capture will not negatively affect or substantially impair existing riparian and upland communities (Section 5.5). In view of the host of natural services that riparian and upland ecosystems provide, which include erosion control, sediment accretion, enhanced habitat, ground shading, carbon sequestration, and oxygen production, appropriate steps should be in place for their preservation and conservation.

5.7  Transborder impacts

The Tierra del Sol Solar project is located on the U.S. side of the international border, directly adjacent to the community of Jardines del Rincon, in Mexico (Fig. 37). The project's magnitude and possible impact on the environment are the subject of intensive study. Nevertheless, the cognizant Mexican agencies have not been made officially aware of the project's features. The following letters to that effect are included in the Appendix:

  1. International Boundary and Water Commission (Comisión Internacional de Límites y Aguas).

  2. Government of the State of Baja California (Gobierno del Estado de Baja California).

  3. Municipality of Tecate, Baja California (Ayuntamiento de Tecate, Baja California).

All three agencies, the federal agency (International Boundary and Water Commission, on August 8, 2013), the state agency (Government of the State of Baja California, on August 8, 2013) and the local agency (Municipality of Tecate, Baja California, on July 31 and August 6, 2013), state on and for the record that "to this date, they have not been officially informed about the Tierra del Sol project."

A project as massive as Tierra del Sol Solar, as close to the border as planned, and with significant, diverse and far-ranging impacts, must be communicated in a timely fashion to all stakeholders likely to be affected.

5.8  Border security impacts

The County of San Diego has a "Land Use Policy for Discretionary Permits Adjacent to the International Border" (Policy I-111) (County of San Diego 2013). This policy states specific conditions that apply for discretionary permits requested for properties located within 150 ft from the International Border. Figure 11 shows that the Tierra del Sol Solar project site is located within 150 ft from the International Border. Thus, it is presumed that Tierra del Sol Solar must comply with San Diego County Policy I-111.


6.  LANEAST/LANWEST SOLAR

[Other Impacts]   [Summary]   [Appendix]   [Acknowledgements]   [Endnotes]   [References]      [Top]   [Introduction]   [Description of Projects]   [Water Resources]   [Rugged Solar]   [Tierra del Sol Solar]  

6.1  Location

The LanEast and LanWest Solar Farms are two adjacent projects planned in the Walker Creek watershed, in Boulevard (Fig. 13). The Walker Creek watershed is located immediately south of the McCain valley. The headwaters of Walker Creek are on the Tecate Divide, at elevation 4,251 ft. From its headwaters, Walker Creek flows in a southeastern direction, flowing through Walker Creek meadow toward Walker Canyon. Eventually, the latter flows north through Carrizo Gorge into Carrizo Creek, and then east into the Salton Sea.

6.2  Impacts on local wetlands

The Walker Creek meadow is delineated in blue in Fig. 43. This figure shows that the LanEast/LanWest project site encompasses almost the entire areal extent of the Walker Creek meadow. The drainage area of Walker Creek, measured to the furthest downstream point of the meadow, is 10.8 square miles.

Walker Creek meadow relative to LanEast/LanWest Solar
 Google Earth ®

Fig. 43  Walker Creek meadow relative to LanEast/LanWest Solar [Click on image to enlarge].

Figure 44 shows a southern aspect of the Walker Creek meadow, indicating its location and the general direction of surface and subsurface flow (indicated by the red arrows). Several communities of mesophytes and hygrophytes, with distinctive water affinities, dot the expanse of Walker Creek meadow. Figure 45 shows a community of coast live oak (Quercus agrifolia) along both sides of the Walker Creek meadow. Figure 46 shows a community of river willows (Salix. sp) established within the confines of the meadow.

Southern aspect of the Walker Creek meadow
 Google Earth ®

Fig. 44  Southern aspect of the Walker Creek meadow [Click on image to enlarge].

Partial view of the Walker Creek meadow

Fig. 45  Coast live oak trees along both sides of Walker Creek meadow.

Partial view of the Walker Creek meadow

Fig. 46  River willows within the Walker Creek meadow.

The wisdom of placing a solar energy project directly on top of a meadow/wetland is highly questionable. A wetland is defined as a land area saturated with water, either permanently or seasonally. Proximity of the water table to the land surface is a characteristic of wetlands. Wetlands perform a host of natural services, including sediment retention, nutrient and pollutant uptake, carbon sequestering, migratory bird habitat, and visual aesthetics, among others. In the United States, a federal policy of wetland protection has been established since 1989.17

The groundwater table in the vicinity of Walker Creek, upstream of and through the wetland, lies near the ground surface, indicating the presence of a well established and thriving riparian and wetland ecosystem. The underlying aquifer is a fractured rock aquifer, for which the piezometric head may be spatially varying and largely unpredictable (Love et al. 2000). For instance, the County of San Diego recently drilled a 600-ft well at a distance of 280 ft from the creek thalweg (Fig. 47).18 This well has been flowing in an artesian mode since its inception, indicating the presence of a piezometric head at or above the ground surface (Fig. 48).19

Southern aerial view of Walker Creek meadow
 Google Earth ®

Fig. 47  Location of well [indicated with a red dot] in the vicinity of Walter Creek.

Southern aerial view of Walker Creek meadow

Fig. 48  New water well near Walker Creek, flowing under artesian conditions on September 18, 2013.

6.3  Other hydroecological impacts

Immediately downstream from the LanEast project site, Walker Creek runs through the Walker Canyon Ecological Reserve for about 1.5 miles before reaching [the southwestern boundary of] Anza-Borrego State Park. The ecological reserve lies immediately east of the LanEast project site (Fig. 49). Therefore, groundwater pumping in the vicinity must show conclusively that it does not result in a significant impact to the reserve.

Location of Walker Canyon Ecological Reserve
 Google Earth ®

Fig. 49  Location of Walker Canyon Ecological Reserve relative to LanEast/LanWest project site
[Click on image to enlarge].

6.4  Hydrology and hydraulics

Preliminary hydrologic calculations for the Walker Creek meadow, based on a drainage area of 10.8 square miles, show that the flood discharge may vary from 9,205 cfs to 30,684 cfs.20 Hydraulic calculations for the Walker Creek meadow are shown in Table 13.21 The average width of the meadow is b = 480 ft, the longitudinal channel slope is S = 0.018, and the estimated Manning's n = 0.050. Table 13 indicates that flood flow depths are likely to vary from 2.58 ft to 5.33 ft, and flow velocities from 7.44 fps to 11.99 fps. The impact that these relatively high flow depths and velocities may have on the operation and maintenance of solar energy installations is unknown.

Table 13.  Hydraulic calculations for the Walker Creek meadow.
No. Description Units Return period
Low Medium High
1 Discharge cfs 9,205 18,411 30,684
2 Flow depth ft 2.58 3.92 5.33
3 Mean velocity fps 7.44 9.80 11.99
4 Froude number - 0.82 0.87 0.92

6.5  Water demand

The construction water demand for LanEast/LanWest Solar has not been clearly established. A value of 33.29 ac-ft for the construction period (approximately 1 yr) is estimated here, based on an aerial correlation of LanEast/LanWest Solar (288 acres) with Rugged Solar (73.16 ac-ft for 765 acres) and Tierra del Sol (61.37 ac-ft for 420 acres).

6.6  Groundwater supply

As in the case of Rugged Solar and Tierra del Sol Solar, pumping from groundwater may proceed as long as it does not encroach upon existing groundwater rights, either natural or anthropogenic. A conservative evaluation of groundwater availability, which does not encroach upon existing rights, both natural and human-induced, is based solely on the LanEast and LanWest Solar project areas, which is: 233 + 55 = 288 acres (Table 1.2).

The mean annual precipitation is 1.32 ft (Section 3.1). The estimated recharge coefficient is 5% (Section 3.3). Therefore, the mean annual recharge is:  0.05 × 1.32 = 0.066 ft. The mean annual recharge in volumetric units is:  288 ac × 0.066 ft = 19.0 ac-ft. Table 14 summarizes the calculation of mean annual recharge for the combined LanEast and LanWest Solar projects.

Table 14.  Calculation of mean annual recharge for LanEast and LanWest Solar.
No. Description Section Units Value
1 Project area 2.3, 2.4 ac 288
2 Mean annual precipitation 3.1 in 15.82
ft 1.32
3 Mean annual recharge coefficient 3.3 % 5
4 Mean annual recharge 3.3 ft 0.066
5 Mean annual recharge 6.5 ac-ft 19.0

6.7  Sustainable groundwater yield

Table 15 shows the available groundwater volume for the combined LanEast/LanWest Solar projects, assuming three suitable levels of capture-to-recharge percentage: 10%, 20%, and 30%. The maximum volume that could be pumped from existing wells without encroaching upon established rights is 5.7 ac-ft. Yet the total construction water demand is 33.29 ac-ft. The pumping of this amount of groundwater in one year represents (33.29/19.0) × 100 = 175% of the mean annual recharge, a level of pumping that is sure to place at risk existing natural ecosystems (Section 6.3).

Table 15.  Available groundwater volume for LanEast and LanWest Solar.
No. Description Units Adopted value
1 Capture-to-recharge percentage % 10 20 30
2 Available annual groundwater capture ft 0.0066 0.0132 0.0198
3 Available annual groundwater volume ac-ft 1.90 3.80 5.70


7.  OTHER IMPACTS

[Summary]   [Appendix]   [Acknowledgements]   [Endnotes]   [References]      [Top]   [Introduction]   [Description of Projects]   [Water Resources]   [Rugged Solar]   [Tierra del Sol Solar]   [LanEast/LanWest Solar]  

7.1  Type of Impacts

In addition to the impacts to geohydrological [groundwater] and ecohydrological [riparian and upland] resources described in Sections 4 to 6, utility-scale solar development in the San Diego backcountry will have a pronounced impact on other related natural resources. Impacts to the following natural resources or services are briefly described in this report:

  1. Soils

  2. Nutrients

  3. Flora

  4. Fauna

  5. Carbon sequestration

  6. Landscape.


7.2  Soils

Construction of the Soitec solar projects in the Boulevard area will require extensive disturbance of the natural desert soil, with negative ecological implications. Table 16 shows that the total developed area amounts to 1,473 ac.

Table 16.  Soitec projects planned in Boulevard.
No. Project Area
(ac)
1 Rugged Solar 765
2 Tierra del Sol Solar 420
3 LanEast Solar 233
4 LanWest Solar 55
Sum All four projects 1,473

The construction of solar farms in the Boulevard desert backcountry may produce substantial and largely unrecoverable disturbance to existing soil crusts.22 Biological soil crusts have a significant role in stabilizing soil in a water-limited and, consequently, erosion-prone environment. Crusts in the California desert are particularly vulnerable to anthropogenic stressors, including human footsteps and grading-related disturbances (Fig. 50). Destruction of soil crusts by construction activities will compromise the effectiveness of the natural services of soil stabilization and dust trapping. Crusts are particularly good at sequestering dust, often trapping dust for decades or longer.23 Onsite surveys may be necessary to assess an area's potential for dust emission which are caused by soil crust destruction.

biological soil crust in Boulevard

Fig. 50  A biological soil crust in the Boulevard desert.

7.3  Nutrients

In the California desert, where vascular plants are sparse, biological soil crusts are the main source of nitrogen and carbon. The fine soil particles trapped by biological soil crusts bind essential plant nutrients, increasing soil fertility. Biological crusts act as the main control for nutrient availability in nutrient-limited ecosystems such as the California desert. Once established, vascular plants growing in crusted soils have generally greater biomass and higher nutrient concentrations than plants growing in uncrusted soils (Belnap 2003).24

7.4  Flora

The land disturbed within a solar project site could lead to changes in dominant flora. Extensive habitat disturbances can facilitate the colonization of natural areas by invasive plants (Brooks 2009). Construction machinery and other earth-moving equipment could carry invasive plant material and seeds from other construction sites to the solar site (San Diego State University et al. 2002). The invasive plants will also likely benefit from water used to suppress dust during solar farm construction.

Landscape disturbances that facilitate the spread of invasive grasses can increase the length of the fire season and may also increase the probability of ignition during the heart of the fire season. Alien grasses have a different phenology that the native herbaceous flora. Alien grasses germinate in the fall and dry by early spring, in contrast to the native flora, which germinates in the winter and remains green much longer (Brooks et al. 1999). Decomposition of organic matter is slow in arid regions; thus, thick layers of annual plant litter often develop where annual grasses are abundant. The accumulation of litter can lead to increased size and intensity of fires and can shorten the time between events (Brooks 1999).

Invasive annual species and the frequency and size of fires are positively correlated. Invasive species provide a more persistent and uniformly distributed fuel than is normally supplied by native plants (Brooks and Matchett 2006). Fires were historically uncommon in the California desert due to the sparsely populated vegetative fuel. Therefore, native perennial shrubs are poorly adapted to the increasing frequency of anthropogenic fires (Brooks 2002).25

A shift in the natural fire regime triggered by industrial-scale solar energy generation facilities could give invasive plants an advantage over native plants. Once a fire regime that favors invasive annuals over native plants is established, restoration of preinvasion conditions could be difficult (Brooks et al. 2004). Years of competition from annual grasses may reduce the seed banks of native plants, possibly causing fundamental changes in natural plant community structure and food web dynamics (Brooks 2000).

7.5  Fauna

Fencing surrounding a solar facility removes the habitat for species that cannot penetrate the fencing. For species with limited range, loss of habitat can directly affect species survival. While species may be able to survive by traveling farther distances to access forage, fencing that directly removes a vital habitat patch could severely limit their ability to survive. Fencing can also act as a barrier, restricting or completely blocking the movement of certain species.

7.6  Carbon sequestration

The solar trackers are typically installed in areas were vegetation has been substantially removed or altogether eliminated. The removal of native vegetation effectively removes its carbon sequestration capacity. In essence, global warming is also caused by a decrease in the carbon sequestration capacity of degraded or eliminated ecosystems. The reduction in carbon sequestration capacity must be included as part of an appropriate greenhouse gas analysis (Zhu et al. 2012; Dudek 2012). The loss of other natural services (Section 7.2) which may accrue as a result of vegetation removal could be exceedingly difficult to quantify.

7.7  Landscape

Replacement of native vegetation with a large number of solar trackers (7,290 CPV trackers) will change the rural character of the Boulevard backcountry. The cost in the loss of natural landscape resources does not lend itself readily to economic evaluation. The glare created by the solar panels will detract upon the natural landscape and permanently impair the pristine beauty of the surroundings. The CPV trackers proposed by Soitec are very large (25' × 48' = 1,200 sq ft) (Fig. 12), and the solar farms' massive features (Table 1) will be extremely hard, if not impossible, to mitigate (Fig. 51).

Glare due to Soitec Solar installation

Fig. 51  Glare due to Soitec Solar installation on a typical day [Photo taken at the campus of
the University of California San Diego at 5:00 pm, on September 20, 2013].


8.  SUMMARY

[Appendix]   [Acknowledgements]   [Endnotes]   [References]      [Top]   [Introduction]   [Description of Projects]   [Water Resources]   [Rugged Solar]   [Tierra del Sol Solar]   [LanEast/LanWest Solar]   [Other Impacts]  

8.1  Groundwater recharge

The planned industrial-scale development of solar energy in the Boulevard area will have significant negative impacts on the surrounding environment, its water resources and other related natural resources, such as soil and vegetation. The area has an arid/semiarid climate, with 15.82 in of mean annual precipitation (Section 3.1). The prevailing ecosystem is the chaparral, which thrives under the arid/semiarid conditions of the Coastal Range of Southern California. Surface runoff and surface storage are nearly nonexistent; thus, the only available water for domestic or industrial consumption is groundwater. The local aquifers are fractured-rock aquifers, of fast hydraulic response and low specific yield (Section 4.3; Fig. 24).

The use of groundwater in arid regions, where the supply is scarce, is subject to important theoretical and practical considerations, which to this date remain largely unresolved. The first issue is the method of evaluation of groundwater recharge. In Nature, all groundwater is connected; therefore, the control volume in a specific application cannot be readily ascertained. It follows that any recharge calculation must be arbitrary to some extent (Section 4.5). Taking the contributing surface [watershed] drainage area as the control volume effectively converts the groundwater resource into a commons and, thus, subject to The Tragedy of the Commons (Hardin 1968). Overexploitation by one or more users will perforce mean the eventual demise of the commons and the consequent ruin to all. Thus, a limit must be imposed on the groundwater capture if the resource is to remain sustainable. In addition to hydrogeology, this limit must include hydrological, ecohydrological, and socioeconomic considerations.

The second issue is the method of evaluation of net groundwater recharge. All groundwater is in constant movement, driven by regional hydraulic gradients. Groundwater flow originates in regions of recharge, usually at higher elevations, and moves toward regions of discharge, typically where the water table intersects the ground surface (Section 4.2). Most groundwater discharges into the surface waters, either to constitute the baseflow of streams and rivers, or to sustain nearby lakes and feed riparian/upland/wetland ecosystems (Sophocleous 2000). Very little groundwater manages to bypass the surface waters altogether, discharging into the nearest ocean (Section 3.2). Under pristine conditions, recharge is equal to discharge; therefore, net groundwater recharge is effectively zero. This fact was clearly expounded by Theis (1940) in his early seminal paper on groundwater.26 Capture through pumping increases the recharge and decreases the discharge. Eventually, capture is bound to affect other users in the vicinity, either natural uses (baseflow, riparian, upland, lake, or wetland) or anthropogenic.

The groundwater resources of the Boulevard area are very limited. Recharge in this arid/semiarid region is estimated to be 0.066 ft/yr. A conservative evaluation of groundwater availability, which does not encroach upon existing rights, is based on the projects' area (Sections 4.5, 5.3, and 6.5). Table 17 shows a summary of annual recharge and construction water demands for the Soitec projects being planned in Boulevard. The comparison of the water demand with the groundwater recharge shows that the demand greatly exceeds the recharge.

Table 17.  Summary of water demands for Soitec projects planned in Boulevard.
No. Project Area
(ac)
Annual
recharge
(ac-ft)
Construction
water demand
(ac-ft)
Demand/
recharge
(%)
1 Rugged Solar 765 50.5 73.16 145
2 Tierra del Sol Solar 420 27.7 61.37 221
3-4 LanEast/LanWest Solar 288 19.0 33.29 175

8.2  Sustainable groundwater yield

Sustainable values of groundwater yield are based on a suitable percentage of recharge, even though in practice there is no relation between them (Ponce 2013). A 10% value is considered conservative; a 30% value represents a compromise or mid-point value. Capturing the entire amount of recharge, that is, 100%, or even more, as noted in Table 17, is considered unsustainable, in view of the negative effect that it is likely to have on long-term discharge. A reasonably low value of capture-to-recharge, say 30%, acknowledges the existence of a coupled surface water/groundwater system, seeking to protect baseflow and riparian/upland/wetland resources from water table depletion caused by the excessive pumping of groundwater.

Table 18 shows ratios (and percentages) of water demand-to-allowable capture for the Boulevard Soitec projects. In all cases, the demand greatly exceeds the allowable capture, when sustainable yield is taken into account. It is concluded that the Boulevard area does not have enough groundwater resources to support industrial-scale solar development, even for the one-year construction period.

Table 18.  Water demand to allowable capture for Boulevard Soitec projects.
No. Project Allowable
capture
(ac-ft)
Construction
water demand
(ac-ft)
Water
demand/
allowable
capture
Water
demand/
allowable
capture
(%)
1 Rugged Solar 15.15 73.16 4.83 483
2 Tierra del Sol Solar 8.31 61.37 7.38 738
3-4 LanEast/LanWest Solar 5.70 33.29 5.84 584

8.3  Impacts to hydrology and ecohydrology

Impacts of the proposed industrial-scale solar development to the hydrology and ecohydrology of the Boulevard area are likely to be diverse and wideranging. Important groundwater-sensitive ecosytems dot the expanse of Boulevard near the location of the four Soitec projects being planned. There is a sizable community of coast live oak near the Rugged Solar project, which is likely to be affected by the pumping of groundwater in the vicinity, beyond a sustainable limit (Section 4.3). Within this community, one very large specimen is estimated to be at least 300 years old, a relic by all accounts (Fig. 28).

Numerous springs have been documented in the McCain Valley foothills, next to the Rugged Solar project site. These springs are fed through advective flow in the underlying fractured-rock aquifer (Ponce 2007 [8]). Thus, upland spring-fed woody vegetation stands to be negatively affected by groundwater capture in the vicinity (Figs. 25 and 26). The siting of Rugged Solar through Tule Creek and its flood plain is questionable; the risks of flooding and flood damage are likely to be substantial (Section 4.1).

The Tierra del Sol project site sits partly on top of a hill, where drainage runs in three directions: East to Unnamed Creek, west to Tierra del Sol Creek, and southwest to Cañada Seca (Section 5.5). These three creeks eventually flow into Mexico. The effect that increased runoff due to development will have on the flow of these creeks has not been established. In the event that project water is obtained from local wells, riparian and upland resources in the vicinity will be negatively affected. These include Unnamed Creek, which supports a sizable community of coast live oak (Fig. 40), and the unique upland linear forest of red shank in the neighboring Tierra del Sol watershed (Fig. 42).

The Tierra del Sol project site abuts with the community of Jardines del Rincon, in Mexico. To this date, there is no record of any input having been sought from stakeholders on the Mexican side of the border (see Appendix).

The LanEast/LanWest projects are being sited, for the most part, on top of the Walker Creek meadow (Fig. 43). This is an unfortunate tactical decision (Section 6.2). This meadow performs a host of natural services, which will be eliminated or greatly compromised in the event that industrial-scale solar development takes place as planned (Figs. 44 to 46). In the event that the needed amount of project water is obtained from local wells, there is a high risk that the groundwater table may drop below historic levels, with consequent negative effects on the Walker Creek meadow and associated riparian ecosystems.

The current LanWest plot plan assures the risk of flooding in the event that Walker Creek were to reach flood stage (Section 6.3). With the everpresent threat of global climate change, a heightened flood risk remains a distinct possibility. This is particularly the case during strong El Niño events, which have hit California with recurring frequency in the recent past (Section 4.1).

8.4  Concluding remarks

The planned industrial-scale development of solar energy in Boulevard and surrounding communities is bound to permanently change the rural character of these East San Diego County communities. While the negative impacts of energy development will be felt locally, its benefits will accrue somewhere else, very likely in distant urban settings. Boulevard has an arid/semiarid climate, with limited precipitation, an avowed scarcity of surface water, and often highly destructive floodwaters. Over the years, the lack of reliable surface water has forced local people to rely on groundwater for their survival.

Groundwater is the only source of potable water in the Boulevard area. Yet the prevailing climate effectively means that groundwater recharge is very limited. In addition, calculations of groundwater recharge are generally flawed due to the uncertainty regarding the applicable control volume. Excessive reliance on limited groundwater resources, over and above current consumption, is bound to place at risk existing uses and users, both natural and anthropogenic. Domestic groundwater users on both sides of the U.S.-Mexico border are likely to be affected.

At this juncture, the issues of groundwater sustainability are, unfortunately, not very well defined. Sustainable yield is reckoned to be a moving target, subject to adaptive management (Seward et al. 2006). To remain comprehensive, sustainable yield must include hydrological, ecohydrological, and socioeconomic considerations. In the case of the Boulevard Soitec projects, it is difficult to reconcile the planned/postulated amounts of groundwater capture with the demonstrated needs of riparian and upland ecosystems, which provide valuable natural services. No development, no matter how lofty its aim, should place at risk existing natural ecosystems. Other considerations notwithstanding, the Boulevard Soitec projects must resort to imported water to satisfy their needs.


APPENDIX

[Acknowledgements]   [Endnotes]   [References]      [Top]   [Introduction]   [Description of Projects]   [Water Resources]   [Rugged Solar]   [Tierra del Sol Solar]   [LanEast/LanWest Solar]   [Other Impacts]  

Letters from Mexican agencies (In Spanish).


ACKNOWLEDGEMENTS

[Endnotes]   [References]      [Top]   [Introduction]   [Description of Projects]   [Water Resources]   [Rugged Solar]   [Tierra del Sol Solar]   [LanEast/LanWest Solar]   [Other Impacts]   [Summary]   [Appendix]  

The author wishes to acknowledge the support of Donna Tisdale and the people of the community of Boulevard, in southeast San Diego County. The assistance of Aleksandr Gostomelskiy, San Diego State University civil engineering graduate student, is gratefully recognized. Henry Alberto Castro Garcia communicated with local government agencies in Mexico to secure their input regarding the Tierra del Sol Solar project.


ENDNOTES

[References]      [Top]   [Introduction]   [Description of Projects]   [Water Resources]   [Rugged Solar]   [Tierra del Sol Solar]   [LanEast/LanWest Solar]   [Other Impacts]   [Summary]   [Appendix]   [Acknowledgements]  

1 The engineering plans prepared by AECOM Technical Services Inc. [2/1/2013] specify 84 MW of generating capacity located on approximately 474 acres and includes 3,588 [sic] CPV trackers configured into 61 building blocks, each consisting of 58 trackers, amounting to:  61 × 58 = 3,538 units.

2 The Campo-Cottonwood Creek Sole-Source Aquifer was designated as such on May 28, 1993, under the authority of Section 1424(e) of the Safe Drinking Water Act (Federal Register Citation-49 FR 2948, January 24, 1984).

3 John Mauris, a local Ribonwood Road resident, reports witnessing heavy rains that caused flooding and failure of earthen dams in the Upper McCain Valley (personal communication, August 1, 2013).

4 The hydrologic calculations shown in Table 5 were performed using the Creager formula (Ponce 1989). This formula provides an envelope of measured peak discharges, per unit of drainage area, as a function of drainage area.

5 Anecdotal evidence of flood conditions at Tule Creek was provided by Mark Ostrander during a field interview on August 1, 2013. Ostrander indicated that the flood depth in the Tule Creek floodplain may reach 1.5 ft under typical flood flow conditions. He served as Captain and Batallion Chief at McCain Valley Conservation Camp for 15 years, prior to his retirement from CalFire. The Camp comprises the central part of the Tule Creek floodplain. He mentioned that he had spent 27 years fighting fires along the U.S.-Mexico border area, and professed to be very familiar with the Tule Creek site. He stated to have observed flood conditions at Tule Creek at least 12 times during his 27-yr tenure. This would indicate that the 2-yr flood has a flow depth of about 1.5 ft, confirming the hydraulic calculations performed for this report.

6 The hydraulic calculations shown in Table 6 were performed using ONLINECHANNEL01.

7 Project documents state that a fraction of the solar trackers (339 out of the 3,588, or about 10%) will be subject to some degree of flooding, with depths varying between 2-4 ft and 10-12 ft.

8 The overall damage was $160 million (1976 USD). Twelve (12) deaths were blamed on tropical storm Kathleen (Wikipedia).

9 Tonalites and granodiorites are similar in mineral composition. A tonalite is a plutonic (intrusive) rock where the percentage of plagioclase feldspar, relative to the combined content of alkali and plagioclase feldspars, is greater than 90; in a granodiorite, the percentage varies between 65 and 90 (American Geological Institute, 1997).

10 Other studies suggest that the giant tree shown in Fig. 29 may be much older than 300 years. For instance, a specimen of coast live oak at Stanford University, with a trunk diameter of 55 in (1.4 m) was estimated to be 300 years old. The average rate of annual growth for the Stanford tree would be 0.0047 m. At this average rate of growth, the Boulevard tree would be: 2.4 m / 0.0047 m/yr = 510 years old (Encyclopedia of Stanford trees, shrubs, and vines).

11 Personal communication with Mario Banchetti during the field visit and inspection of August 31, 2013.

12 A preliminary calculation using the Creager formula shows flood discharges ranging from 4,477 cfs to 14,924 cfs.

13 Robert Maupin, personal communication, August 23, 2013.

14 Coast live oak, Quercus agrifolia, is an evergreen oak, highly variable and often shrubby, native to the California Floristic Province. It grows west of the Sierra Nevada from Mendocino County, California, south to northern Baja California, in Mexico (Wikipedia [1]).

15 Red shank (Adenostoma sparsifolium) is unique among the chaparral in that it violates several definitions of sclerophyllous plants. First, red shank remains physiologically active during summer drought; thus, it is drought tolerant without being drought dormant (Hanes, 1965). Secondly, its shallow root system suggests that its moisture for summer growth must come from the top layers of the substrate. Red shank seems to be a type of shrub well adapted to drought conditions, but lacking the obvious morphological characteristics suggesting such adaptability (Shreve, 1934).

16 A lineament is a linear feature in a landscape which is an expression of an underlying geological structure such as a fault. Fracture zones, shear zones and igneous intrusions such as dykes can also give rise to lineaments (Wikipedia [2]).

17 The North American Wetlands Conservation Act (P.L. 101-233) (December 13, 1989) authorizes a wetlands habitat program, administered by the United States Fish and Wildlife Service, which provides grants to protect and manage wetland habitats for migratory birds and other wetland wildlife in the United States, Mexico, and Canada.

18 The well was recently drilled by the County of San Diego to support the planned new Boulevard Fire Station. On September 3, 2014, county staff estimated the free flow of this well at 3 gallons per minute (Donna Tisdale, personnal communication).

19 On September 18, 2014, inspection of this well by the author of this report revealed the presence of groundwater flowing out of the ground under artesian conditions (Fig. 48).

20 The flood discharge calculations were performed using the Creager formula (Ponce 1989).

21 The hydraulic calculations shown in Table 13 were performed using ONLINECHANNEL01.

22 According to Belnap (2003), in the California desert full recovery of soil crusts will take over 1,000 years. Other studies have suggested that cyanobacteria may take 20 to 50 years to recover, while lichens and mosses may take 100 to over 1,000 years (Webb et al. 2010).

23 Rich Reynolds, a senior scientist with the U.S. Geological Survey, stated in an interview: "These kinds of deserts, and almost all deserts, sequester dust. They are not only areas where dust is emitted, but they are areas where dust is deposited, and this dust, over a few decades to hundreds of years to thousands of years, works its way down, gets down into the cracks in the soils, and accumulates in these desert soils. In this way, deposited dust can be concentrated in shallow soil, just below the surface, and deeper." (Personal communication on September 25, 2013).

24 There are many ways in which biological soil crusts can influence soil fertility and plant nutrient concentrations: (1) contributing carbon and nitrogen to the soils; (2) exuding sticky, negatively charge polysaccharides which bind and prevent leaching loss of positively charge nutrients essential to plants; (3) secreting ring-shaped chemical compounds called chelators that keep nutrients available for plants, despite high soil pH; (4) increasing soil temperatures and nutrient uptake rates; (5) increasing dust capture and soil stabilization, thereby improving fertility and water-holding capacity; and (6) increasing soil aggregation (Belnap 2003).

25 This is because abundant aliens with superior dispersal and reproductive abilities such as Bromus rubens are likely to establish sooner and possibly preempt later colonization of native annuals through competitive exclusion (Brooks 2000; 2002).

26 For a biographical account of C. V. Theis' contributions to hydrogeology, see White and Clebsch (1994).


REFERENCES

   [Top]   [Introduction]   [Description of Projects]   [Water Resources]   [Rugged Solar]   [Tierra del Sol Solar]   [LanEast/LanWest Solar]   [Other Impacts]   [Summary]   [Appendix]   [Acknowledgements]   [Endnotes]  

AECOM. 2012. Rugged Solar LLC Project, Climate change and greenhouse gas emission analysis, Major Use Permit 3300-12-007, prepared for County of San Diego, Department of Planning and Land Use, December.

American Geological Institute (1997). Glossary of Geology. Julia A. Jackson, editor, Alexandria, Virginia.

Alley, W. M., T. E. Reilly, and. O. E. Franke. 1999. Sustainability of ground-water resources. U.S. Geological Survey Circular 1186, Denver, Colorado, 79 p.

Belnap, J. 2003. The world at your feet: Desert biological soil crusts. Frontiers in Ecology and the Environment, Vol. 1, No. 4, 181-189.

Beta. 2013a. East County Substation Project Ammended Construction Water Supply Plan [1]. Prepared for San Diego Gas and Electric, Revised July 3, 2013.

Beta. 2013b. East County Substation Project Ammended Construction Water Supply Plan [2]. Prepared for San Diego Gas and Electric, Revised September 30, 2013.

Brooks, M. L. 1999. Alien annual grasses and fire in the Mojave desert. Madroño, 46, No. 1, 13-19.

Brooks, M. L. 2000. Competition between alien annual grasses and native annual plants in the Mojave desert. American Midland Naturalist, 144, 2000, 92-108.

Brooks, M. L. 2002. Peak fire temperatures and effects on annual plants in the Mojave desert. Ecological Applications, 12, No. 4, 1088-1102.

Brooks, M. L., C. M. D'Antonio, D. M. Richardson, J. B. Grace, J. E. Kelley, J. M. DiTomaso, R. J. Hobbs, M. Pellant, and D. Pyke. 1999. Effects of invasive alien plants on fire regimes. Bioscience, 54, No. 7, 677-688.

Brooks, M. L., and J. R. Matchett. 2006. Spatial and temporal patterns of wildfires in the Mojave Desert, 1980-2004. Journal of Arid Environments, 67, 148-164.

County of San Diego. 2013. Land Use Policy for Discretionary Permits Adjacent to the International Border. Board of Supervisors Policy I-111.

Dudek. 2012. Greenhouse Gas Analysis Technical Report, Tierra del Sol Solar Farm Project, Major Use Permit 3300-12-010, Boulevard, San Diego County, California. 605 Third Street, Encinitas, California 92024, December.

Brooks, M. L. 2009. "Spatial and temporal distribution of nonnative plants in upland areas of the Mojave desert," in The Mojave desert: Ecosystem processes and sustainability, R. H. Webb and others, editors, The University of Nevada Reno, 343-377.

Fernandes, J., N. Flynn, S. Gibbes, et al. 2010. Renewable energy in the California desert: Mechanisms for evaluating solar development on public lands. M.S. Thesis, School of Natural Resources and Environment, The University of Michigan, April.

Freeze, R. A., and J. A. Cherry. 1979. Groundwater. Prentice-Hall, Inc., Englewoord Cliffs, New Jersey.

Hanes, T. L. 1965. Ecological studies of two closely related chaparral shrubs in Southern California. Ecological Monographs, 35, No. 2, 213-235.

Hardin, G. 1968. The Tragedy of the Commons. Science, Vol. 162, 1143-1148.

HDR Engineering 2011. Tule Wind Project - General Plan Ammendment Report. November.

Love, A. J., P. G. Cook, G. A. Harrington, and C. T. Simmons. 2001. Groundwater flow in the Clare Valley. Department of Water Resources, Government of South Australia, Adelaide, Australia.

L'vovich, M. I. 1979. World water resources and their future. Translation of the original Russian edition (1974), American Geophysical Union, Washington, D.C.

Maimone, M. 2004. Defining and managing sustainable yield. Ground Water, Vol. 42, No. 6, November-December, 809-814.

NASA. 2012. Could a hurricane ever strike Southern California?. Feature.

Pillsbury, N. H., and J. P. Joseph. Coast live oak thinning studies in the Central Coast of California --- Fifth-year results. USDA Forest Service General Technical Report PSW-126. 320-332.

Ponce, V. M. 1989. Engineering Hydrology: Principles and Practices. Prentice Hall, Englewood Cliffs, New Jersey.

Ponce, V. M., and A. V. Shetty. 1995a. A conceptual model of catchment water balance. 1. Formulation and calibration. Journal of Hydrology, 173, 27-40.

Ponce, V. M. 2006. Impact of the proposed Campo landfill on the hydrology of the Tierra del Sol watershed. Online report.

Ponce, V. M. 2007. Sustainable yield of groundwater. Online report.

Ponce, V. M. 2012. Thompson Creek Groundwater Sustainability Study. Online report.

Ponce, V. M. 2013. Cumulative impacts on water resources of large-scale energy projects in Boulevard and surrounding communities, San Diego County, California. Online report.

Prudic, D. E., and M. E. Herman. 1996. Ground-water flow and simulated effects of development in Paradise Valley, a basin tributary to the Humboldt River, in Humboldt County, Nevada. U.S. Geological Survey Professional Paper 1409-F.

San Diego State University, et al. 2002. Three issues of sustainable management in the Ojos Negros valley, Baja California, Mexico. Online report.

Scanlon, B. R., K. E. Keese, A. L. Flint, L. E. Flint, C. B. Gaye, W. M. Edmunds, and I. Simmers. 2006. Global synthesis of groundwater recharge in semiarid and arid regions. Hydrological Processes, 20, 3335-3370.

Scripps Institution of Oceanography. 2013. High-accuracy climate reconstruction reveals mark of human activities on late 20th-century El Niños. News, June 30, 2013.

Seward, P., Y. Xu, and L. Brendock. 2006. Sustainable groundwater use, the capture principle, and adaptive management. Water SA, Vol. 32, No. 4, October, 473-482.

Shreve, F. 1934. The problems of the desert. The Scientific Monthly, 38, No. 3, March, 199-209.

Sophocleous, M. 2000. From safe yield to sustainable development of water resources - The Kansas experience. Journal of Hydrology, Vol. 235, 27-43.

State of California Public Utilities Commission. 2013. Letter from Amy Baekr to Don Houston.

Theis, C. V. 1940. The source of water derived from wells: Essential factors controlling the response of an aquifer to development. Civil Engineering,, Vol. 10, No. 5, May, 277-280.

Webb, R. H., J. Belnap, and K. A. Thomas. 2009. Natural revovery from severe disturbance in the Mojave Desert. In The Mojave Desert: Ecosystem Processes and Sustainability, Richard Webb and others, editors, The University of Nevada Press, 343-377.

White, R. R., and A. Clebsch. 1994. C. V. Theis: The Man and His Contributions to Hydrogeology.

World Water Balance and Water Resources of the Earth. 1978. U.S.S.R. Committee for the International Hydrological Decade, UNESCO, Paris, France.

Zhu, Z., B. M. Sleeter, G. E. Griffith, S. M. Stackpoole, T. J. Hawbaker, and B. A. Bergamaschi. 2012. An assessment of carbon sequestration in ecosystems of the Western United States - Scope, methodology, and geography. U.S. Geological Survey Professional Paper 1797.


 About the author

Dr. Victor M. Ponce has taught hydrology at San Diego State University since 1980. He has more than forty (40) years of experience in the water resources field. His extensive record of research and practice may be browsed at  ponce.sdsu.edu


http://boulevardsoitec.sdsu.edu PDF file
131202

Documents in Portable Document Format (PDF) require Adobe Acrobat Reader 5.0 or higher to view; download Adobe Acrobat Reader.