>

&nsbp;

01
02
03
04
05
06
07
08
09
10
VERTICAL ALIGNMENT

Three possibilities:

    1. Above ground, with a net import of materials to construct the levee system.

    2. By balancing cut and fill, with a minimum import or export of materials.

    3. Below ground, with a net export of river bed material.

Next:  12            Previous:  10            Last:  20
11
12
13
14
15
16
17
18
19
20